Power. Land. Building.
Ready when the grid isn't

He who controls the power controls the intelligence.

Power-First Campuses for AI

Yellowbox develops power-first data center sites that come online faster than the grid alone allows. We control the land, the air permits, and the behind-the-meter natural gas power, and every site stays grid-ready as it scales.

_edited.jpg

Behind-the-Meter Power

 

Yellowbox owns and operates behind-the-meter natural gas power on fully entitled, power-first campuses. Tenants get near-term power with no dependence on grid interconnection timelines.

​

What We Deliver

  • Secured pipeline gas supply and air-permitted generation capacity.

  • Behind-the-meter power sized for large-scale AI deployments​​

How It’s Enabled

  • Sites selected where gas supply and permitting feasibility meet

  • Designed to integrate grid and CCGT supply as each campus scales.

Result

  • Firm power in years, not the 2030s

From Powered Land to Lease-Ready Campus

Yellowbox carries each site from raw land through entitlement, permitting, and firm on-site power to a lease-ready campus. Power comes first, so buildout never waits on the grid. â€‹

​

How a Campus Comes Together

  • Master-planned campuses pairing data center pads with on-site generation

  • Site and shell design coordinated with tenant requirements

  • Phased buildout that preserves long-term flexibility

Outcome​

  • Power, entitled campuses ready for rapid construction and deployment

Brad Smith · Vice Chair & President, Microsoft

"Artificial intelligence is the electricity of our age."
Microsoft policy blog, 2025

Why Yellowbox

Built for Speed

icon_power_first.png

Power First

We secure power before design, construction, or deployment decisions are made.

icon_grid_optional.png

Grid Optional

Our sites run on firm on-site generation, independent of interconnection timelines, and stay grid-ready as they scale.​

icon_built_for_scale.png

Built for Scale

Our campuses are designed for large-scale, phased growth aligned with hyperscale requirements.

icon_exit_flexible.png

Exit Flexible

Every campus can be sold, taken into a joint venture, or built out and operated. How we monetize stays flexible; the value we create doesn't.

Lafayette Public Power Authority_edited.jpg

Power-Ready Campuses

Entitled land, approved air permits, and firm behind-the-meter power available on timelines the grid can't match.

yellowbox_logo_on-dark.png

Yellowbox originates, permits, and owns behind-the-meter power for AI data centers.