
He who controls the power controls the intelligence.
Power-First Campuses for AI
Yellowbox develops power-first data center sites that come online faster than the grid alone allows. We control the land, the air permits, and the behind-the-meter natural gas power, and every site stays grid-ready as it scales.

Behind-the-Meter Power
Yellowbox owns and operates behind-the-meter natural gas power on fully entitled, power-first campuses. Tenants get near-term power with no dependence on grid interconnection timelines.
​
What We Deliver
-
Secured pipeline gas supply and air-permitted generation capacity.
-
Behind-the-meter power sized for large-scale AI deployments​​
How It’s Enabled
-
Sites selected where gas supply and permitting feasibility meet
-
Designed to integrate grid and CCGT supply as each campus scales.
Result
-
Firm power in years, not the 2030s
From Powered Land to Lease-Ready Campus
Yellowbox carries each site from raw land through entitlement, permitting, and firm on-site power to a lease-ready campus. Power comes first, so buildout never waits on the grid. ​
​
How a Campus Comes Together
-
Master-planned campuses pairing data center pads with on-site generation
-
Site and shell design coordinated with tenant requirements
-
Phased buildout that preserves long-term flexibility
Outcome​
-
Power, entitled campuses ready for rapid construction and deployment

Why Yellowbox
Built for Speed
Power First
We secure power before design, construction, or deployment decisions are made.
Grid Optional
Our sites run on firm on-site generation, independent of interconnection timelines, and stay grid-ready as they scale.​
Built for Scale
Our campuses are designed for large-scale, phased growth aligned with hyperscale requirements.
Exit Flexible
Every campus can be sold, taken into a joint venture, or built out and operated. How we monetize stays flexible; the value we create doesn't.
